Caption | Workers putting tracks onto a M3 tank at the Detroit Arsenal Tank Plant, Warren, Michigan, United States, circa 1940-1942, photo 1 of 2 ww2dbase | |||||||
Photographer | Alfred Palmer | |||||||
Source | ww2dbaseUnited States Library of Congress | |||||||
Identification Code | LC-USE6-D-001265 | |||||||
More on... |
| |||||||
Photo Size | 488 x 369 pixels | |||||||
Photos in Series | See all 2 photos in this series | |||||||
Photos at Same Place | Warren, Michigan, United States | |||||||
Added By | C. Peter Chen | |||||||
Licensing | This work is believed to be in the public domain. Please contact us regarding any inaccuracies with the above information. Thank you. |
|||||||
Colorized By WW2DB |
Colorized with Adobe Photoshop |
Did you enjoy this photograph or find this photograph helpful? If so, please consider supporting us on Patreon. Even $1 per month will go a long way! Thank you. Share this photograph with your friends: Stay updated with WW2DB: |
Visitor Submitted Comments
All visitor submitted comments are opinions of those making the submissions and do not reflect views of WW2DB.
Change View
Desktop ViewSearch WW2DB
Modern Day Location
WW2-Era Place Name | Warren, Michigan, United States |
Lat/Long | 42.4969, -83.0417 |
Current Site Statistics
- » 1,150 biographies
- » 337 events
- » 43,917 timeline entries
- » 1,241 ships
- » 350 aircraft models
- » 207 vehicle models
- » 375 weapon models
- » 123 historical documents
- » 260 facilities
- » 470 book reviews
- » 28,547 photos
- » 432 maps
Famous WW2 Quote
"I have returned. By the grace of Almighty God, our forces stand again on Philippine soil."General Douglas MacArthur at Leyte, 17 Oct 1944
5 Dec 2011 04:50:56 PM
TANKS "R" US:
The Detroit Tank Plant was built in six months, it was five city blocks long and two city blocks wide. The factory was built on 113 acres of farm land the first M3 was built
in April 1941 before the plant was even finished. During WWII the factory built over 20,000 tanks.
The sponson on the tanks right mounted a 75mm gun, but it had limited traverse, the turret mounted a 37mm gun and the smaller turret on top, mounted a .30 caliber machine gun and another .30 caliber machine gun in the upper hull.
The turret casting weighed 4,000lbs. alone thats before all the internal fittings are installed.
The M3 weighted 23 tons, the tracks for each
side were 40 feet in length. The M3 cost the
US taxpayer $33,000 each, the plant built 10
a-day.